Heading Icon

EV Charging Station Installation & Maintenance

The infrastructure behind EV charging is more involved than it looks. Between site assessment, civil construction, utility coordination, electrical upgrades, and final commissioning, a charging installation touches nearly every discipline in the construction trades. FTCI manages all of it under one roof — from the first site visit through ongoing maintenance — so projects don’t stall waiting on multiple contractors to coordinate.

Commercial EV Charger Installation

Commercial EV charging installations require more than running conduit to a parking lot. Load capacity, utility coordination, civil work, and compliance with local permitting all have to come together before a single charger goes live. FTCI handles the full scope for commercial properties, ensuring every installation is built to code and positioned to support future expansion as EV adoption continues to grow.

Level 2 EV Charger Installation

Level 2 chargers are the workhouse of most commercial and multi-family EV deployments — practical for workplace charging, residential applications, and anywhere drivers have extended dwell time. FTCI installs Level 2 EVSE with the electrical and civil work handled in-house, keeping installs efficient and minimizing disruption to existing operations.

Level 3 (DC Fast) Charger Installation

DC fast chargers demand significantly more from the electrical infrastructure behind them — higher amperage, dedicated service, and in many cases a utility upgrade before installation can begin. FTCI’s experience with utility coordination and high-capacity electrical work makes us well-suited for Level 3 deployments, whether for a single fast-charge location or a multi-unit corridor installation.

EV Site Assessments & Load Studies

Before any charger goes in the ground, the site has to be evaluated. FTCI conducts thorough site assessments and load studies to determine existing electrical capacity, identify infrastructure gaps, and develop a clear picture of what a charging installation will require — including whether a utility upgrade is needed. Getting this right upfront prevents costly surprises mid-project.

Utility Upgrades for EV Chargers

EV charging infrastructure frequently outpaces the electrical service already in place, particularly at older commercial properties and multi-family buildings. FTCI works directly with utility providers, carrying an on-hand inventory of approved metering equipment and switchgear to keep upgrade projects moving when equipment availability would otherwise cause delays. We support the full process from utility application and civil construction through meter set and cutover.

EV Charger Maintenance & Repair

An EV charging network that isn’t maintained is a liability. FTCI offers scheduled maintenance services designed to keep charging infrastructure operating reliably, extend the lifespan of installed equipment, and catch issues before they become failures. We also provide repair services when something does go wrong, with the technical depth to diagnose and resolve problems across a wide range of EVSE hardware.

Fleet Charging Installation

Fleet charging has its own set of demands — higher throughput, dedicated circuits, load management considerations, and infrastructure designed for vehicles that charge on a schedule rather than at a driver’s convenience. FTCI designs and installs fleet charging solutions for commercial and municipal operators, with the electrical and civil capabilities to support installations of any scale.

Multi-Family EV Charging Installation

Multi-family properties present unique challenges for EV charging: shared electrical infrastructure, limited panel capacity, tenant equity considerations, and the need to plan for future demand without overbuilding today. FTCI brings the site assessment, load study, and installation expertise to help property owners navigate these complexities and deliver charging solutions that work for residents and building operators alike.

Workplace EV Charging Installation

Workplace charging has become an increasingly important amenity for attracting and retaining employees — and in many jurisdictions, new commercial construction is required to accommodate it. FTCI installs workplace EV charging infrastructure for employers and property owners, handling everything from initial load studies and utility coordination through installation and commissioning.

Forged Technical Consulting Logo

Let's Talk EV Infrastructure

From a single commercial charger to a multi-site fleet charging network, FTCI has the electrical, civil, and utility expertise to get it built right. Tell us about your project and we’ll take it from there.